Blue film, and drilling out rivets
Two small lessons from the last few weeks of the elevator: how much of the blue protective film to remove (and when), and how to drill out a poorly set rivet without touching the hole.
read more →Two small lessons from the last few weeks of the elevator: how much of the blue protective film to remove (and when), and how to drill out a poorly set rivet without touching the hole.
read more →Van's Service Bulletin SB-00043 wants a rope of tank sealant run eight inches down the inside of the elevator rear spar, into a slot that closes to an inch and a half. Here's the sub-$30 rig that got it there.
read more →The elevator trim tab is the first part in the build to see FlameMaster CS3204 tank sealant. What's actually in the can, why it beats RTV silicone and JB Weld for this job, and why a single quart runs $168.
read more →How I worked out whether Cherry MAX blind rivets could stand in for driven rivets in a high stress spot on the horizontal stabilizer.
read more →Some sources say that there is a specific order to dimpling and priming. I'm not 100% sure that this is the case.
read more →The horizontal stabilizer spars are the largest non-skin part in the RV-14 empenage kit. Painting it introduces new challenges. I've also added a new step in the priming process.
read more →It's been a while. I'm still here, being my same self.
read more →We've finally set the first rivets!
read more →Shoot. I RYNO'd the skin
read more →I thought vans was Over-estimating. They were not.
read more →I've figured it out!
read more →Finally, something I know how to do!
read more →There is nothing that takes so much time in this endeavor.
read more →The kit arrives! first steps and inventory.
read more →The careful considerations that I had to make before making the first purchases
read more →a quick test page
read more →A simple log of the hours used to build the plane
read more →