Deburring

Well, It's 1 week in, and it's already tiring.

The aluminum in the kit has a few steps that all parts need to run through, doing them over and over and over again is already getting quite boring, but it's a strict necessity. For me, that workflow goes:

For those counting at home, that's 13 steps that need to happen before the instructions are even executed on! Of course, I could simply drop the middle 4 instructions, and do the dimpling and match drilling afterward. This would save me 2 steps, one assembly and one disassembly.

Addendum 4/28. Only after I'm writing this did I find out that in most parts of the empennage that vans will dedicate a step to tell you to go prime stuff. While this changes the order of operations, it doesn't really change the size or nature of the list itself.